What sets the minimum order quantity

An MOQ is the smallest order a factory can run economically. In Bangladesh it is driven mostly by:

At Inara Sourcing, MOQs are flexible and agreed order by order, based on the style, fabric and quantity. We match your target quantity to a partner factory that fits it.

Tip: using stock or local fabric, fewer colours per style, and shared trims across styles all make smaller quantities workable.

How long production takes

Lead time runs from sample approval to the goods being ready to ship. Its biggest factor is where the fabric comes from:

StageWhat happens
SamplingProto, fit and pre-production samples and lab dips, until the PP sample is approved
FabricYarn sourcing, knitting or weaving, dyeing and finishing
ProductionCutting, sewing, washing or printing, finishing and packing
InspectionInline checks and a final inspection before shipment
ShippingSea freight from Chattogram, or air from Dhaka

For Inara Sourcing programmes, estimated bulk lead time is 80–90 days using local yarns or fabrics and 100–120 days using imported yarns or fabrics. Ocean transit to your market comes on top.

Planning backwards from your launch date

  1. Start from the date the goods must be in your warehouse.
  2. Subtract ocean transit and customs clearance for your route.
  3. Subtract the bulk lead time for your fabric type.
  4. Subtract sampling time — allow extra for new styles or new factories.

That date is when your brief needs to be with your sourcing partner. After quote approval, ask for a time-and-action calendar so each stage has a date and a person responsible.

Capacity

Our partner factories produce around 13.65m pieces a month in total: 4.4m circular knit, 3.45m sweaters, 2.5m sportswear, 2m woven, 1.2m denim and 100k outerwear.

Frequently asked questions

What is the typical MOQ for clothing in Bangladesh?

It depends on fabric, product type and factory. At Inara Sourcing MOQs are flexible and agreed order by order based on the style, fabric and quantity.

What is the lead time for garments from Bangladesh?

For Inara Sourcing programmes, bulk production takes about 80–90 days with local yarns or fabrics and 100–120 days with imported yarns or fabrics, after sample approval, plus shipping time.

How can I lower my minimum order quantity?

Use stock or local fabric, reduce the number of colours per style, and share trims across styles; all three make smaller runs workable for factories.

Planning your next collection?

Share your styles, fabrics, target GSM and quantities. We match them to the right factory and send a time-and-action calendar with the quote.

Discuss your collection